Menu
Thu, April 25, 2024

Everest Bank installs crematorium at Swargadwari Ghat, Bhairahawa

A A- A+

Everest Bank has installed energy efficient and eco-friendly cremation system at Swargadwari Ghat, Bhairahawa. The machine has heat recovery system and reflector to utilise waste heat and minimise cremation duration; this will save more than 250 kgs of wood per cremation. The system helps control pollution as the smoke is passed through wet scrubber to remove hazardous air pollutants and toxins before releasing into the atmosphere. The machine was handed over to Siddhartha Nagar Municipality, Bhairahawa in the presence of Chief Minister Shankar Pokharel, Deputy Mayor Uma Kafle and ward representatives of Siddhartha Nagar Municipality, Bhairahawa. The handing over was done by Sh. GK Negi, CEO Everest Bank.

Published Date:
Post Comment
E-Magazine
MARCH 2024

Click Here To Read Full Issue